Work Study dan Method Engineering

Metode Pengukuran Waktu Kerja:

  • PENGUKURAN LANGSUNG
    1. STOPWATCH TIME STUDY (Snapback / Continuous)
    2. WORK SAMPLING
  • PENGUKURAN TAK LANGSUNG
    1. PREDETERMINED TIMES
    2. STANDARD TIME DATA SYSTEMS
    3. MOTION TIME DATA SYSTEMS
      • Motion Time Analysis (MTA)
      • Motion Time Standard (MTS)
      • Dimensional Motion Time (DMT)
      • Work Factor (WF)
      • Methods Time Measurements (MTM)
      • Maynard Operation Sequence Time (MOST)

Peta-peta Kerja:

  • PETA KERJA KESELURUHAN
    1. Operation Process Chart
    2. Flow Process Chart
    3. Flow Diagram
  • PETA KERJA SEBAGIAN
    1. Multiple Activity Chart
    2. Gang Process Chart
    3. Man-Machine Chart
    4. Operator Chart
    5. Left-Hand Right-Hand (Two Handed Process) Chart
    6. Simultaneous Motion (SIMO) Diagram